Facebook Pixel

Instructor <a href="instructor-velimir">Velimir</a> <a href="instructor-alexis-ocasio-agosto">Alexis Ocasio Agosto, Agrimensor, Ingeniero Civil, PLS, EIT, GISP, CDT</a> in Ingenieros

View as List Grid

Items 1-10 of 52

Page
por página
Set Descending Direction
  1. 3T - Arc Flash Basics and Hazard Planning Program
    $50.00

    This course gives an overview of arc flash hazards and concisely reports the different causes, nature, findings, directions and processes related with arc flash hazards. In order to address the hazard, it is first required to formulate an understanding of the process.


    Learn More
  2. 3T - Principles of HVDC Transmission
    $50.00

    The question that is frequently discussed is: “Why does anyone want to use D.C. transmission?” One reply is that electric losses are lower, but this is not true. Amount of losses is determined by the rating and size of chosen conductors. Both D.C. and A.C. conductors, either as transmission circuits or submarine cables can generate lower power losses but at increased cost since the bigger cross-sectional conductors will typically lead to lower power losses but will unfortunately cost more.


    Contact Hours: 3 Hours - Technical

    Learn More
  3. 3T - Gas Insulated Substation Definitions and Basics
    $50.00

    When determining between AIS or GIS technology, some elements alone, for example aesthetics, may be an overcoming impact on a user’s conclusion. Nevertheless, most of the time the best conclusion asks for assessing many elements and soliciting input data from many sections within an investor’s organization. It is also critical to note that the optimal substation arrangement may not be solely AIS or GIS. Sometimes a mix of the two (i.e., hybrid or mixed-technology) might be the best arrangement. Typically, most of the factors will prefer GIS technology, but it is the value or importance given to the considerations that decides if the return on investment is justifiable to choose GIS over AIS technology. Consideration that can be measured should be assigned importance weights based on the user’s needs.


    Contact Hours: 3 Hours - Technical

    Learn More
  4. 3T - Conceptos Geométricos de la Geodesia
    $50.00

    El curso discute los Conceptos Geométricos de Geodesia que influyen en los métodos, equipos y procedimientos que utilizan los agrimensores modernos. En el pasado, la geodesia era necesaria para levantamientos de mayor precisión y envergadura como el establecimiento de controles y cartografiados nacionales. En la práctica moderna, se requiere que los trabajos estén referenciados a sistemas de coordenadas estatales o nacionales, lo que hace más relevante tener un conocimiento funcional de geodesia que permita cumplir con las exigencias actuales.


    Horas de contacto: Tres (3) horas técnicas

    Learn More
  5. 2T - Power System Transient Stability Study Fundamentals
    $30.00

    The ability of a power system, containing two or more synchronous machines, to continue to operate after a change occurs on the system is a measure of its stability. The stability problem takes two forms: steady-state and transient.


    Contact Hours: 2 Hours - Technical

    Learn More
  6. 2T - PV Systems Safety
    $30.00

    This course was made as a reference with helpful and easily-accessible instructions on how to work safely with PV systems. Some recommendations are based on the common sense and they will help readers to keep safe. Course includes description of specific hazards, their frequent causes, and ways to prevent and avoid them.


    Contact Hours: 2 Hours - Technical

    Learn More
  7. 3T - Intro-to-ALTA-ACSM
    $50.00

    Con el tiempo, el estilo de los estudios de topografía ha evolucionado de manera diferente de una región a otra y de un inspector a otro. Esto puede complicar o retrasar una transacción. Siguiendo los estándares de Requisitos de Detalle de ALTA / ACSM estudios topográficos de los títulos de tierra, la profesión de la topografía también estandarizará sus productos para facilitar un entendimiento común para los distintos clientes.

    El curso Intro-to-ALTA-ACSM explica el contenido y la finalidad de un reconocimiento terrestre de ALTA / ACSM, tanto para los topógrafos como para los clientes. Para los clientes, explica cómo pedir la encuesta y cómo utilizar e interpretar los dibujos finales. Para el inspector, explica cómo mostrar las muchas partes de la encuesta en un formato estandarizado para facilitar el uso del cliente. Quiere decir que Intro-to-ALTA-ACSM proporciona un protocolo de comunicación para cumplir con las necesidades y objetivos de cada uno.

    Learn More
  8. 3T - Explorando el Centro de servicios de mapas de FEMA
    $50.00

    En vigor desde el 19 de abril 2005 los Mapas de Inundación de FEMA, (FIRM, significa “Flood Insurance Rate Maps”), se convirtió en el único documento oficial para la determinación de zonas de inundación para ser utilizado por las agencias federales, estatales y municipales. Los mapas de la Junta de Planificación de Puerto Rico Planificación ya no están disponibles. Los Mapas de Puerto Rico se actualizaron el 18 de noviembre del 2009. Los Mapas impresos ya no son publicados.

    Horas Contacto: Tres (3) horas técnicas

    Learn More
  9. gis-for-rookies gis-for-rookies Sale
    3T - GIS for Rookies
    Special Price $50.00 Regular Price $75.00

    GIS for Rookies es un curso introductorio que discute el uso de GIS Open Source Software.  El curso introduce al participante a los conceptos de GIS, sus operaciones y cómo le puede favorecen en su práctica.  Al completar el curso Gis for Rookies, el participante tendrá una idea muy clara de todo lo que GIS puede hacer por él.   

    Learn More
  10. 3T - Distance Protection
    $50.00

    Since the impedance of a transmission circuit is relative to its length, for distance measure it is suitable to use a relay able to measure the impedance of a circuit up to a present point (the reach point). Such a protection relay is known as a distance protection relay and is made to function only for faults happening between the protection relay location and the chosen reach point, therefore providing discrimination for short circuits that may happen in different line portions.


    Contact Hours: 3 Hours - Technical

    Learn More
View as List Grid

Items 1-10 of 52

Page
por página
Set Descending Direction